Pre-Engineered Building

Kamnath Group is Top Pre Engineered Building(PEB) Manufacturers in Ahmedabad, Gujarat, Noida, Uttar Pradesh, Mumbai Maharashtra, India, UK, UAE, South Africa, East Africa. Pre Engineered Steel Buildings are structures constructed using steel built up sections. These structures are designed and fabricated in the factory, along with that its assembled at the site of construction using bolted connections. We are also a leading pre engineered metal building design company in India. The various sections of these buildings are custom built at factory per the exact size. They are transported to the site for assembly. This type of structural concept is generally used to build industrial buildings, metro stations, aircraft hangers, malls, corporate houses, indoor & outdoor sports stadiums, weekend homes, farm houses, warehouses and storage units etc. Pre Engineered Building(PEB) Steel & Metal Structure Manufacturers in Ahmedabad, India, UK, UAE, South Africa, East Africa by the Kamnath Group. Install Pre Engineered Steel Building Structure in Gujarat with help of Kamnath Group.

  • Torfnester Ltd Corporate Office

    Office Structure

    50 metric ton | Year of completion: 2022


    READ MORE

    Torfnester Ltd Corporate Office


    Project by: Torfnester Ltd

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 1 months

    Location: Sindhubhavan road, Ahmedabad

  • Nestle Project Ocean

    Factory Shed

    500 metric ton | Year of completion: 2021


    READ MORE

    Nestle Project Ocean


    Project by: PSP Projects

    Consultant/ Architect/ Structure Designer: Mott MacDonald

    Project duration: 4 months

    Location: Sanand, Ahmedabad

  • Reliance VIP

    Rolla Deck Roof structure

    75 metric ton | Year of completion: 2020-21


    READ MORE

    Reliance VIP


    Project by: Reliance Town Ship

    Consultant/ Architect/ Structure Designer: Kalindi Technical Services

    Project duration: 1 months

    Location: Jamnagar, Gujarat

  • Khandwala Corporate House

    PEB Beam to avoid construction of concrete column

    50 metric ton | Year of completion: 2020-21


    READ MORE

    Khandwala Corporate House


    Project by: The Khandwala Group

    Consultant/ Architect/ Structure Designer: Ducon Consultants Pvt. Ltd.

    Project duration: 1 months

    Location: Iscon - Ambli Road

  • Mann Party Plot

    Banquet Roof structure

    150 metric ton | Year of completion: 2019-20


    READ MORE

    Mann Party Plot


    Project by: Mann infra

    Consultant/ Architect/ Structure Designer: Shree Shilp PMC/ Rushabh Consultant

    Project duration: 2 months

    Location: Sindhu Bhavan Road

  • Zydus Cadila (By PSP)

    Auditorium & Terrace Roof structure

    400 metric ton | Year of completion: 2018-19


    READ MORE

    Zydus Cadila (By PSP)


    Project by: PSP Projects

    Consultant/ Architect/ Structure Designer: Bhoomi Consultant

    Project duration: 3 months

    Location: Vaishnodevi Circle, SG Highway

  • AKSHAR WAREHOUSE

    Warehouse

    125 metric ton | Year of completion: 2018-19


    READ MORE

    AKSHAR WAREHOUSE


    Project by: Kamnath infra

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 1.5 months

    Location: Changodar, Ahmedabad

  • APOLLO INFRRATECH

    Factory Structure

    250 metric ton | Year of completion: 2017-18


    READ MORE

    APOLLO INFRRATECH


    Project by: Apollo Inffratech Pvt. Ltd.

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 3 months

    Location: Chatral (Ahmedabad-Mehsana State Highway)

  • K.U. Distributor-Rice Mill, Africa

    Rice Mill Plant Structure

    250 metric ton | Year of completion: 2012-13


    READ MORE

    K.U. Distributor-Rice Mill, Africa


    Project by: KU Distributors

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 4 months

    Location: Malavi, Africa

  • K.U. Distributor - Warehouse, Africa

    Warehouse Structure

    150 metric ton | Year of completion: 2012-13


    READ MORE

    K.U. Distributor - Warehouse, Africa


    Project by: KU Distributors

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 2 months

    Location: Malavi, Africa

  • Sona Pump

    Factory Structure

    100 metric ton | Year of completion: 2012-13


    READ MORE

    Sona Pump


    Project by: Sona Pump

    Consultant/ Architect/ Structure Designer: Kalinda Technical Services

    Project duration: 1 months

    Location: Kukarwada, Mahesana

  • Divya Bhaskar Press

    Factory Structure and Canopy

    100 metric ton | Year of completion: 2011-12


    READ MORE

    Divya Bhaskar Press


    Project by: Divya Bhaskar

    Consultant/ Architect/ Structure Designer: R. G Desai

    Project duration: 1 months

    Location: Changodar, Ahmedabad